Pinnacle recognizes the vital importance of safety and the significance it holds to both project success, and company integrity, therefore safety is Pinnacles top priority. Pinnacles policies and procedures reflect our impeccable standards, and our safety record continues to serve as testament to our commitment.

St. Lucie Power Plant

Project Location: Jensen Beach, Florida

Client: SGT/URS Washington Division

Scope: Provide project management, supervision and craftsmen necessary to support the removal and reinstallation of piping systems and components associated with the replacement of steam generators.

St. Lucie Power Plant - Steam Generator Replacement Outage

Pinnacle Precision Services (Pinnacle) was selected to support the secondary side piping and related component welding activities associated with the replacement of the steam generators at the Florida Power and Light St. Lucie Power facility. Pinnacle provided a project manager, supervisors, and craftsmen required to support the project. During the course of this work Pinnacle performed final weld preparation and fit up of main steam and main and auxiliary feedwater piping and pipe supports, and on various sampling, level control and instrumentation piping. Pinnacle then performed all welding activities in accordance with the ASME code.

Pinnacle met or exceeded all of its customer’s expectations regarding quality, safety and schedule adherence. Pinnacle completed all of its work activities on or ahead of schedule with a first time quality factor of 100%.