Pinnacle recognizes the vital importance of safety and the significance it holds to both project success, and company integrity, therefore safety is Pinnacles top priority. Pinnacles policies and procedures reflect our impeccable standards, and our safety record continues to serve as testament to our commitment.

Turkey Point Power Station (Spring 11)

Project Location: Homestead, FL

Client: Bechtel

Scope: Provide project management, supervision and craftsmen necessary to perform demolition and replacement of feed-water heater drain piping, associated control valves, and miscellaneous steam supply piping to feed-water heaters.

Turkey Point Power Station - Extended Power Uprate (Spring 11)

Pinnacle Precision Services, LLC was selected to provide project management; supervision and craftsmen to perform modifications to plant equipment and systems in support of an “Extended Power Uprate” project.  Work activities included demolition of numerous heater drain piping control valve stations, supports and related instrumentation.  Upon completion of these activities, Pinnacle installed redesigned piping, valve stations, supports, instrumentation and related components.  Additionally, Pinnacle performed demolition and replacement activities on portions of steam supply piping systems being upgraded to chrome piping due to flow accelerated corrosion issues.  This work was critical path to the overall outage schedule.  All work activities were completed ahead of schedule and “first time quality” exceeded industry standards with zero rework of installed welds.  Pinnacle maintained a perfect safety record with zero OSHA recordable accidents and zero OSHA lost time accidents.